December 2009
March 2011
Extremely rugged, undulating and mixed terrain including the presence of rocky Canadian Shield outcrops, fractured limestone and deep swampy locations caused significant access, foundation and anchor installation challenges. Construction was only possible during the winter seasons with frozen ice road access.