This project was logistically challenging, as most structures had to be placed in rock excavations.
We procured and constructed the collector system for a new wind farm, consisting of 30 km of 35 kV overhead lines and 7 km of 230 kV grid connection (braced post). Yet another project completed on budget, on time and without incident!